# Activity Log — Project 737D

## 2026-06-22

### 20:54 MYT — Sir shared Drive folder "737" via Gmail
- Subject: "Folder shared with you: '737'"
- From: SNS (via Google Drive)
- Contents: 2 PDF files
  - `737D Project OP.pdf` (901 KB) — QC Readiness Planning, 2 pages, Rev. table 2025-2027
  - `737D QBI.pdf` (920 KB) — QBI for FITTING, Rev.0 dated 22-Jun-2026

### 20:55 MYT — Files downloaded
- Saved to `/home/ubuntu/PERMANENT/Project_737/sources/`
- pdftotext extracted, 652 lines (OP) + 286 lines (QBI)

### 20:56 MYT — Project folder initialized
- Standard 4-canonical-file structure created
- README + TARGET drafted from PDF extraction

### 20:57 MYT — Discord + VPS live
- Category `🚗 Project 737D` (id 1518600812719509534) + forum `#737d-docs` (id 1518600815143817418) + root thread (id 1518600817559470271)
- VPS server on port 8104, HTTP 200 from external IP
- 8/8 files synced to Drive

### 21:27 MYT — Control Dashboard built (per sir's "checklist that can track progress + comment each item")
- File: `public/control_dashboard.html` (29.7 KB)
- **60 checklist items** extracted from OP, grouped into 5 sections:
  - 1. MAN (5), 2. METHOD (16), 3. MATERIAL (12), 4. MACHINE (11), Planning (15)
- 14 owners tracked (Fitri, Rozaidi, Ira, Effendi, Kamil, Aziz, Izwan, Rudy, Zafarul, Kniz, Shahrul, Wan Nasir, Roslan, TBD)
- Features: per-row Status + % + Comment popover, KPI summary cards, auto-save to localStorage, Export JSON, Copy CSV, Print, filter by status/owner/section
- Live: http://43.156.228.124:8104/public/control_dashboard.html

### 23:22 MYT — Date-Sequence Dashboard built (per sir's "checklist by date seq")
- File: `public/control_dashboard_date.html` (41 KB)
- **64 items** sorted by N-X timing (relative to N=0 anchor date)
- N-week column, target date column, color-coded by status:
  - **This week (yellow border)** — items due now
  - **Due in 2W (amber)** — upcoming
  - **Overdue (red)** — target passed, status ≠ Done
  - **Past/done (dim)** — historical
- **Anchor date selector** — change N=0 to recalculate ALL dates (default: 22-Jun-2026 = QBI Rev.0 date)
- **Timeline strip** — 53-week view (N-52 to N+0), each week = item count, color by section mix
- Phase filter: N-1 year+ / N-6 month / N-3 month / N-1 month / N-2 week / ACF&1A / SPTT / MP&MA / OTOP&SOP / Post SOP
- **"Show only this week + overdue"** button — for daily standup view
- Live: http://43.156.228.124:8104/public/control_dashboard_date.html

### Next actions (queued)
- [x] Discord category + forum + root thread — DONE
- [x] VPS server on port 8104 — DONE
- [x] Drive sync — DONE (8/8 files)
- [x] Control dashboard with 60 items — DONE
- [ ] DECK.pptx (TBP-style, per sir's format preference) — pending
- [ ] Optional: TBP A3 walk-through if sir picks specific 737D problem
- [ ] Sir input → fill TARGET.md with concrete How Much / By When numbers
- [ ] Post dashboard link in Discord root thread
- [ ] Periodic check-in reminder to update dashboard (cron?)

#project